Dumping fill.

June 3, 1996

It finally stopped raining long enough to back-fill around the foundation. I ordered some gravel and fill from a trucking company. The excavator then arrived in the early evening and back-filled the perimeter walls with a thick layer of gravel on the drain tile followed with dirt fill left over from excavating the foundation. The inside of the foundation will be leveled off with a lime waste fill in preparation for the concrete flat work. This interior fill will be positioned using a skid loader, however I have a cold storage room which is too small for a skid loader so I had Chris dump fill into this room with his Excavator. Of course I will still have to level this room by hand.