Concrete Mud Pies.
July 11, 1996
Several layers of thick plastic sheeting and a 1' x 1' gridwork or rerod was placed on top of the reinforced plywood flooring. The concrete was then poured over the whole thing. I had my builder call as soon as the concrete floor was poured so Margaret could rush out with the kids and get some handprints set in the concrete.